The floors with the structures might reduce their built-in strength with the ground and will crack due to lack of adhesion in the ground tiles.Mark the places to get drilled inside the brickwork or mortar, commencing with the area affected because of the dampness and lengthening at the very least 6 inches out. Space the holes about four.five inches